From a new kitchen in the existing room to a side-return or rear extension that doubles it: structure, first fix, floors, installation and decoration under one contract, with the kitchen itself from your supplier or sourced through us.
A kitchen renovation is mostly first fix: new water, waste and gas runs to where the new layout needs them, a circuit for every appliance, lighting set out so there is no shadow on the worktop, and a floor that is level before anything goes on it. We do all of that, prepare the room, install the kitchen and finish it so the joinery, worktops, tiling and decoration meet cleanly.
In a London terrace the kitchen is usually at the back and the side return is wasted. Extending into it, or out to the rear, gives a kitchen-dining room with the garden on the other side of the glass. We build the extension and the kitchen as one project, so the steel, the drainage, the underfloor heating and the lighting are all designed around the kitchen layout rather than the other way round.
New kitchen in the same place. Existing services kept where sound; new worktops, tiling and decoration.
Strip to the walls, full new first fix for the new layout, floor, installation and finishing.
Opening up or extending, bespoke joinery, special fixtures and fittings, with our design and procurement services.
Recent kitchen work includes a bathroom-and-kitchen programme in Wandsworth with a rebuilt dividing wall and new timber floor, and a kitchen extension and refurbishment in Hackney. See our projects.
Typically £14,000 to £25,000 for the building work — strip-out, first fix, plastering, flooring, installation, tiling and decoration — excluding the kitchen units, worktops and appliances, which you buy from your chosen supplier or source through our procurement service. A side-return or rear kitchen extension is usually £70,000 to £120,000 for the build, depending on size and glazing.
Three to four weeks on site for a renovation in the existing room, provided the kitchen is delivered on time. An extension is ten to sixteen weeks from breaking ground to the kitchen being usable.
Many single-storey rear and side-return extensions fall under permitted development, but conservation areas, flats and larger extensions need an application. Our architect partners check this at the start and handle the application if one is needed.
Yes. We install kitchens from any supplier and template the worktops once the units are in. If you prefer, our procurement service orders, tracks and receives everything on site for you.
Not in the room being renovated. We set up a temporary sink and power for a microwave and kettle elsewhere where the layout allows, and tell you the exact dates the cooker and sink go out and come back.
Your kitchen supplier usually designs the units; we design the services around that layout — plumbing, gas, electrics and lighting — and can produce the layout and M&E drawings through our design service. We don't choose colours or finishes but can recommend designers we have worked with.
Two minutes for an indicative price three ways, confirmed with a free site survey.